In the face of unprecedented 5 mile laterals proposed by Extraction for the Draco Pad, it’s an appropriate time to analyze the maximum measured depths as reported to the ECMC for wells in Colorado to answer the question, “Have 5 mile laterals ever been drilled in Colorado before?” Let’s not bury the lead; according to the data reported to the ECMC, the answer is a resounding NO!
The longest laterals we’ve ever seen in Colorado are 4 miles long; the vast majority are less than 3 miles. The 5 mile laterals proposed at Draco are 25% longer than the longest laterals ever drilled in Colorado, and the proposed wellbores are 70% longer than any wells completed before 2024.
Now that the Draco OGDP application has been deemed complete by the ECMC, the documents submitted with the application are available to view/download. Here, we’re taking an opportunity to analyze the submitted Form 2B Cumulative Impacts Data Identification Form and share some new information.
Extraction plans to spend 9 weeks constructing the location, 18 weeks to drill the wells, and 23 weeks to complete the wells for Draco, for a total of 50 weeks of pre-production activities, assuming two concurrent electric drilling rigs will be used. The wells will be in production for 20 years.
The operator estimates 158,125 diesel vehicle miles will be driven before the wells are put into production to deliver sand, pipe, and other materials to the site.
The project will use 3.27 million pounds of proppant/sand during completions activities.
They plan to use 12,885,000 barrels of water to frack the 26 wells at Draco, for a total of 541 million gallons of water and an average of 20.8 million gallons per well.
They will not be recycling produced water because “the infrastructure necessary to reuse or recycle water does not exist in this area.”
Extraction plans to plug and abandon 22 wells at 18 locations, as well as removing 24 oil tanks and 13 produced water tanks.
Thank you for joining us at the Erie Community Library on June 12th from 5:00 to 7:00 for an information and question & answer session about the Draco Oil & Gas Development Plan (OGDP). We had over 50 people attend! Community activists, local elected officials, and other knowledgeable experts were on hand to answer your questions about this large-scale oil & gas development plan that affects neighborhoods in Erie, Colorado.
Watch the recording of the April 16, 2024 Erie Board of Trustees Draco Study Session on the Town of Erie’s web site. The Draco presentation begins at the 54 minute mark.
Locations where Extraction Oil & Gas had originally indicated they would plug legacy wells are shown in red circles with dotted red lines.
This map depicts the existing oil & gas infrastructure in and around the proposed drilling and spacing unit (DSU) for the Draco Oil and Gas Development Plan (OGPD). The well pad for the proposed 26 wells is several miles east of the DSU, just north of the Crestone Hub at CR 6 and CR 7 in unincorporated Weld County.
We’ll be updating this FAQ as we get additional information from the various involved parties. Where possible, links to additional/source material have been provided.
“Modern high-volume hydraulic fracturing is a technique used to enable the extraction of natural gas or oil from shale and other forms of “tight” rock (in other words, impermeable rock formations that lock in oil and gas and make fossil fuel production difficult). Large quantities of water, chemicals, and sand are blasted into these formations at pressures high enough to crack the rock, allowing the once-trapped gas and oil to flow to the surface.”